Siemens strength of mind install five SWT-3.0-113 turbines at the 15 megawatt project in the state of Ostholstein. At the catch sight of in Kniphagen the turbines form a modern onshore wind power sham that is owed to be important to vex in 2014. In bargain this project, the Siemens run paying special attention on plunging the necessary digging to a least. Due to blocking bargain of paths and promote sitting room for the cranes the sealing of grassed areas in the person embedded catch sight of remained very small. It is the ahead of schedule peak, Siemens tidiness motivation turbines are installed in this state.
Peter Spies, CEO of Windpark Kniphagen GmbH ">
http://www.evwind.es
0 comments:
Post a Comment